Bega CWF Cell 3 Landfill Cap Construction
About this project
Working closely with Council, RARE completed the capping of Cell 3 at the active waste facility. Close coordination was required to minimise disruption to operations at the adjacent Cell 4.
The capping system consisting of subsoil layers, a geo-composite liner system with drainage and LLDPE layers and finally a vegetation layer with surface drainage element. The system was connected to the already installed Cell 2 liner and delivered on time and on budget for Council.
RARE’s willingness to find solutions on the ground greatly streamlined the project. Our winning tender involved an alternate liner procurement methodology that saved council several months in duration before RARE had even mobilised to the site.
How we helped
- Preparation of work method statements and QA/QC procedures for third-party approval
- Procurement of liner materials including factory and post manufacture testing
- Initial earthworks and subsoil layer construction
- Liner install and connection to Cell 2 liner
- Geonet drainage layer
- Vegetation layers and surface drainage elements
- Preparation of construction report for EPA sign off
Project Details
Client
Bega Valley Shire Council
Location
Frogs Hollow, NSW
Value
$1M
Timeline
May 2022 – January 2023